Steel module frames in the MY-Fab factory
What we do

Design, manufacture and install, or supply the components

Steel-framed volumetric construction, built under one roof in our factory and delivered as a complete building or as products for your project team.

01

Turnkey delivery

One contract from design to practical completion. Our design team develops the scheme with your consultants, and our own teams manufacture, install, fit out and hand over.

Design and consultant coordination
Planning and Building Control support
Manufacture under one roof in our factory
Groundworks, installation and fit-out
Commissioning and handover
02

Products and components

We supply MY-Fab products to your project team, with scope set to fit your design and programme.

Steel module frames in the factory
01

Structural modules

Our steel-framed volumetric system is designed around your layout rather than a fixed module range. Each module combines a hot-rolled steel frame with cold-formed steel floors, roof and walls, and leaves the factory fully fitted out. The system builds from single buildings up to 15 storeys.

Modules have been fire tested by BRE to 30, 60 and 90 minutes, and our MYC05 and MYC15 systems hold full BOPAS accreditation, including a 60-year durability and maintenance assessment. Transfer structures allow commercial space at ground level beneath the modules, and the building can be finished in brick, render or rainscreen cladding.

The system is suited to hotels, student accommodation, co-living, residential institutions and homes.

Building height

Up to 15 storeys

Our BOPAS-accredited system comes in two forms. MYC05 is designed for buildings of up to five storeys. MYC15 builds up to 15 storeys, with a reinforced concrete core carrying the modules.

5Storeys with MYC05
15Storeys with MYC15
13Storeys at The Rubik, Southampton
02

Bathroom pods

Steel-framed bathroom pods for residential, hotel and commercial projects, fitted out and tested in the factory before they leave the factory. We manufactured more than 400 amenity pods for Tribe Manchester Airport.

Finishes and layouts are specified to suit the project.

Finished bathroom pod with walk-in shower
Fabricated steel beam in the workshop
03

Structural steel

Beams, columns, complex frames, prefabricated staircases and lift cores, cut, welded and finished in our own steel workshop.

Our steelwork is certified to EN 1090 Execution Class 2, with UKCA-marked frames, and is available as part of a MY-Fab building or supplied with erection and installation to other projects.

Structural steelArchitectural steelStaircases and lift coresErection and installationFinishing and coating
04

Windows and facades

Windows, internal and external doors, curtain walling and complete facade packages, designed and manufactured under the same roof by our in-house team and MY Facades Ltd.

Because the envelope is made alongside the modules, it is coordinated with the structure from the start.

Aluminium window profiles in storage